Bolu Biomass

(7 + 12 MW) In this study, meat poultry wastes in Bolu region, which has become a serious environmental problem, will be burned in a high-performance combustion plant and electricity will be produced. In this way, sustainable waste management will be ensured while at the same time energy will be generated. The project aims to […]

Efeler Biogas – 2.4 MW / 3.6 MW

EFELER Biogas Facility, which was completed in Germencik district of Aydın and commissioned in 2013, provided technical and financial consultancy services. This facility, which has disposed of the wastes of more than 7,500 bovine animals of the Efeler farm where it was established on its land, has also been calculated and given the feasibility of […]

Ovacık Biogas – 4.8 MW

Necessary calculations were made for the sizing of Ovacık biogas plant which will produce clean energy while targeting the disposal of bovine wastes in Lüleburgaz province and technical and financial feasibility was prepared and organization of suppliers and contractors was provided. In the light of the technical calculations, the capacity of the facility to be […]

Tire Biogas – 4.8 MW

Turnkey installation service is provided for Tire Biogas Power Plant, which is established in Tire, İzmir, and produces clean energy while targeting the disposal of bovine wastes in the region. In the light of the technical calculations, the capacity of the facility to be established was determined and the technology to be applied together with […]

Çorum Biogas – 4.8 MW

Within the scope of this study, a technical and financial review of the Çorum biogas plant project was conducted for investors and banks. The data of the project was examined and the necessary calculations were made. The report is prepared in the format requested by the bank to cover both technical calculations and financial cash […]

Çubuk Biogas – 1.8 MW

ALBE group has established a facility that produces biogas and organic fertilizer by using egg poultry wastes which is a serious environmental problem in Ankara Çubuk district. In the light of the technical calculations, the capacity of the facility to be established was determined and the technology to be implemented was determined together with the […]

Migros Waste Management

Within the scope of this project, it is aimed to identify the existing practices related to the management of waste belonging to Migros, to calculate the amount of waste generated, to identify the types of waste and to facilitate the creation of a usable and sustainable waste management. Working under the category of separation of […]