Author Archives: Aylin Akgul
PalSens Level A12
PalSens Pressure C12
pH and ORP Sensors
PalSens Indicator and Transmitter
PalSens Indicator and Transmitter The developed PalSens motherboard can read digital, analog, 4 – 20 mA or RS485. The data is indicated by 5 digit LED screens of 38 mm at the desired location. This displayed data can be transmitted to automation as 4 – 20mA or RS485. IP67 box works with high performance in […]
Operation of Biogas, Electricity and Fertilizer Plants
Operation of Biogas, Electricity and Fertilizer Plants; The construction, installation, assembling, maintenance and repair of the plants under optimum conditions is very important and operation is also very important. A biogas plant consists of three stages in terms of production.These stages are biogas production, electricity production and fertilizer production. Each production stage can be considered […]
Extended Warranty
All installations that are serviced and repaired by Pales Technic benefit from extended warranty conditions for equipment and materials of various classes. In order to provide this service in this way, the facility must also be operated by Pales Technic team.
Consumables and Spare Parts
Supply of Consumables and Spare Parts; In this context, Pales Technic provides all the stock of consumables and spare parts normally required by the facility and keeps them in the field. We are responsible for keeping all stock items ready when needed in the field.
Supply of Expert
Supply of Expert; In this context, a full-time maintenance and repair team is on site. This team has received the relevant trainings in a real-size plant operation and has the necessary knowledge and experience in plant maintenance and repair. The maintenance and repair team operates in the fields of spare and consumable material stocks, work […]
Maintenance and Repair Services
Maintenance and Repair Services; Maintenance, repair and operation of the plant is as important as the construction and installation. Due to the services to be provided within this scope, a healthy facility can be operated on average 8,300 hours per year. This means an average of 8.3 million kWh of electricity per MW, 5,800 tons […]